Stopped by to check out progress on the construction while walking back to my car after class, and snapped some pics while talking to some of the workers.
Seems some modifications to the original plans, only one i heard for sure was the possibility of building the board 30' from the m-seal club front and connecting back the whole way instead of the spec'd 25'.
Dirt work and removal of all trees has been finished, and seems everything is in-line for the real work to begin now.
New pics of progress..nothing much change minus some trees, but did get some pics of markings for the outline of the size (I enhanced them to make the marks more visible.)
and have pics of the sewer pipe that will have to be re-located, it looked as if it had been there since before the field house had been built.
Seems some modifications to the original plans, only one i heard for sure was the possibility of building the board 30' from the m-seal club front and connecting back the whole way instead of the spec'd 25'.
Dirt work and removal of all trees has been finished, and seems everything is in-line for the real work to begin now.
New pics of progress..nothing much change minus some trees, but did get some pics of markings for the outline of the size (I enhanced them to make the marks more visible.)
and have pics of the sewer pipe that will have to be re-located, it looked as if it had been there since before the field house had been built.